Had a beautiful day to work today. Started with a little painting on the cowl retaining pins and reinforcement patches. I only painted these because it happens to be "yellow" days here in Virginia. Everything is yellow from the pollen from these.
The rain last night cleared the air enough for some early morning painting. It will be another two weeks before I can do any finish painting. Here are the cowl pins , they were a little rusty so they got bead blasted and primed.
The eyebrow reinforcements got primed too.
I then preped the cowling for final riveting. I wanted to install the doublers with some epoxy, so I scrubbed the cowl and the repair pieces with phosphoric acid etch and scotch brite pad. I figured that would rough the surface and clean at the same time. All I had for epoxy was some T88 so that is what I used. I put on a really thin coat, so that I did not get much squeeze out and ruin my clecos and tools. I managed to squeeze all the rivets except for one.
It came out pretty good, only time will tell how it will hold up in service. Except for a few details and painting the cowl is finished.
That was all I got done today, my helper was busy studying for the new air traffic controller exam.
Sunday, April 17, 2011
Saturday, April 16, 2011
Eyebrows
Could not force myself to finish the cowl today, the weather was too bad to work with the door open and I really need the extra room for that job. Everything is finished except for the final riveting. I'm still debating the use of some epoxy on these doublers. I went with counter sunk rivets. Here are a couple shots of the completed parts.
Today I worked on the eyebrows. These have a tendency to crack due to the increased wind load and prop wash on the 90 HP cubs . Since the eyebrows that came with the project looked almost new, I figured I would do this now to save problems later. You can see in this picture the very small bearing area of the steel tabs that attach the eyebrow to the cylinder. You can see that this one is already cracked.
I made 4 triangular shaped doublers from 0.032 2024-T3 aluminum to go between the steel tab and the eyebrow to help distribute the loads.
Here is the right side ready to rivet after I put on a little primer tomorrow.
I finished both sides. This side required a little forming an trimming to fit.
The rest of the evening was spent watching some fantastic thunderstorms roll through.
Tomorrow will be painting and riveting day, hopefully these two projects will be finished.
Today I worked on the eyebrows. These have a tendency to crack due to the increased wind load and prop wash on the 90 HP cubs . Since the eyebrows that came with the project looked almost new, I figured I would do this now to save problems later. You can see in this picture the very small bearing area of the steel tabs that attach the eyebrow to the cylinder. You can see that this one is already cracked.
I made 4 triangular shaped doublers from 0.032 2024-T3 aluminum to go between the steel tab and the eyebrow to help distribute the loads.
Here is the right side ready to rivet after I put on a little primer tomorrow.
I finished both sides. This side required a little forming an trimming to fit.
The rest of the evening was spent watching some fantastic thunderstorms roll through.
Tomorrow will be painting and riveting day, hopefully these two projects will be finished.
Thursday, April 14, 2011
Another pair
In typical pilot "one up man ship" my friend Scott had a model photo shoot at his hanger last week. I missed it because I thought "some guy wants to take pictures with a model" meant a model airplane !
I finally got back to work on the Cub this week. I had some family events and just kinda lost interest for some reason. This last repair to the nose bowl had me in a mental block, but I finally started on it today. I decided to make an internal doubler for the carburetor and heater air intake. Since it is a compound curve I used some 0.032 2024-0 metal I had on hand. I cut it oversize then formed it into the cowl. I was going to use two pieces but it came out OK using one. It is still oversize in this shot.
I then trimmed this to size. I am still debating the number of rivets and the type. I think 470 rivets would be best for crack resistance but flush would look a lot better. I will probably put this in with some epoxy also. Here it is with the air intake trimmed to shape. I still need to trim the inside to make it look professional.
I'm not sure about the double row on the sides, I may go double with half the number of rivets. Every hole is a crack waiting to happen. Tomorrow is supposed to be another beautiful day, hopefully I will get this finished.
I finally got back to work on the Cub this week. I had some family events and just kinda lost interest for some reason. This last repair to the nose bowl had me in a mental block, but I finally started on it today. I decided to make an internal doubler for the carburetor and heater air intake. Since it is a compound curve I used some 0.032 2024-0 metal I had on hand. I cut it oversize then formed it into the cowl. I was going to use two pieces but it came out OK using one. It is still oversize in this shot.
I then trimmed this to size. I am still debating the number of rivets and the type. I think 470 rivets would be best for crack resistance but flush would look a lot better. I will probably put this in with some epoxy also. Here it is with the air intake trimmed to shape. I still need to trim the inside to make it look professional.
I'm not sure about the double row on the sides, I may go double with half the number of rivets. Every hole is a crack waiting to happen. Tomorrow is supposed to be another beautiful day, hopefully I will get this finished.