It's time for the fuselage to go back to the airport. I can't work on the skylight because the garage roof is too low and I need to finish the wing root fairings so the wings need to be installed. Today I started by completing the eyebrows, I squeezed the 3/32 rivets but had to drive the 1/8's that hold the tabs. They came out nice.
A little touch up on the black paint and they will be ready to go. With the epoxy dry on the cowl repairs, I removed all the clamps and finished a few details on the lower cowl. I fitted the cabin/carb heat inlet duct.
Everything fits good here, I then installed the mounting pins I painted yesterday.
I'm pretty happy with how this turned out, there are a lot of repairs but they should not be too noticeable from the outside after painting. Here's a couple shots.
I spent the rest of the afternoon making a bracket to replace the left front cowl pin. I did not realize it at first but there is a substantial difference between the 85/90 case and the 65 case at the front tie bolts. This means that the brand new Univair fitting I bought will not fit. I decided to make my own fitting which required cutting and grinding some 4130. I got all the pieces made today but will wait until the flight engine is on to complete it. Here's a shot, it has to bend the other direction.
The rest of the day was spent moving crap out of the way so I could get the fuselage out of the garage. I managed to get it all hooked up to the truck just before dark and will leave for the airport first thing in the morning. I used the same 4 point tie to the tailwheel fork I used to bring it home. Here's BC giving the rig a once over.
That's it for today, the engine stand will come home tomorrow and assembly will start on the engine. I will probably spend the rest of the week cleaning the hanger and the garage.
Monday, April 18, 2011
Sunday, April 17, 2011
Cowling progress
Had a beautiful day to work today. Started with a little painting on the cowl retaining pins and reinforcement patches. I only painted these because it happens to be "yellow" days here in Virginia. Everything is yellow from the pollen from these.
The rain last night cleared the air enough for some early morning painting. It will be another two weeks before I can do any finish painting. Here are the cowl pins , they were a little rusty so they got bead blasted and primed.
The eyebrow reinforcements got primed too.
I then preped the cowling for final riveting. I wanted to install the doublers with some epoxy, so I scrubbed the cowl and the repair pieces with phosphoric acid etch and scotch brite pad. I figured that would rough the surface and clean at the same time. All I had for epoxy was some T88 so that is what I used. I put on a really thin coat, so that I did not get much squeeze out and ruin my clecos and tools. I managed to squeeze all the rivets except for one.
It came out pretty good, only time will tell how it will hold up in service. Except for a few details and painting the cowl is finished.
That was all I got done today, my helper was busy studying for the new air traffic controller exam.
The rain last night cleared the air enough for some early morning painting. It will be another two weeks before I can do any finish painting. Here are the cowl pins , they were a little rusty so they got bead blasted and primed.
The eyebrow reinforcements got primed too.
I then preped the cowling for final riveting. I wanted to install the doublers with some epoxy, so I scrubbed the cowl and the repair pieces with phosphoric acid etch and scotch brite pad. I figured that would rough the surface and clean at the same time. All I had for epoxy was some T88 so that is what I used. I put on a really thin coat, so that I did not get much squeeze out and ruin my clecos and tools. I managed to squeeze all the rivets except for one.
It came out pretty good, only time will tell how it will hold up in service. Except for a few details and painting the cowl is finished.
That was all I got done today, my helper was busy studying for the new air traffic controller exam.
Saturday, April 16, 2011
Eyebrows
Could not force myself to finish the cowl today, the weather was too bad to work with the door open and I really need the extra room for that job. Everything is finished except for the final riveting. I'm still debating the use of some epoxy on these doublers. I went with counter sunk rivets. Here are a couple shots of the completed parts.
Today I worked on the eyebrows. These have a tendency to crack due to the increased wind load and prop wash on the 90 HP cubs . Since the eyebrows that came with the project looked almost new, I figured I would do this now to save problems later. You can see in this picture the very small bearing area of the steel tabs that attach the eyebrow to the cylinder. You can see that this one is already cracked.
I made 4 triangular shaped doublers from 0.032 2024-T3 aluminum to go between the steel tab and the eyebrow to help distribute the loads.
Here is the right side ready to rivet after I put on a little primer tomorrow.
I finished both sides. This side required a little forming an trimming to fit.
The rest of the evening was spent watching some fantastic thunderstorms roll through.
Tomorrow will be painting and riveting day, hopefully these two projects will be finished.
Today I worked on the eyebrows. These have a tendency to crack due to the increased wind load and prop wash on the 90 HP cubs . Since the eyebrows that came with the project looked almost new, I figured I would do this now to save problems later. You can see in this picture the very small bearing area of the steel tabs that attach the eyebrow to the cylinder. You can see that this one is already cracked.
I made 4 triangular shaped doublers from 0.032 2024-T3 aluminum to go between the steel tab and the eyebrow to help distribute the loads.
Here is the right side ready to rivet after I put on a little primer tomorrow.
I finished both sides. This side required a little forming an trimming to fit.
The rest of the evening was spent watching some fantastic thunderstorms roll through.
Tomorrow will be painting and riveting day, hopefully these two projects will be finished.
Subscribe to:
Posts (Atom)